A9 Simplonstrasse North (VS): Refurbishment of Rothwald Bridge

Client
Federal Roads Office ASTRA
Consultant
IM Maggia Engineering Ltd
Period
2017-2019
Construction costs
CHF 5.5 million
Scope of services
  • Action plan (measures project)
Description

The A9 national road was upgraded between 1960 and 1975 through the addition of numerous bridges and galleries to make it safe in winter as a pass road. Since then there has been no major overhaul, therefore rehabilitation of both road and the many engineering structures is necessary.  The phased general maintenance concept for national roads includes a complete refurbishment of section No. 70, the lot for Rothwald Bridge. The open stretch of the A9 national road, a total of 1.416 km, will be repaired. This stretch of the A9 road is made up of a total 1.316 km of open road while 0.1 km of the road goes through the Mittenbäch gallery.

Main Data
  • Length of road: 1.416 km