Bzhuzha (Georgia): Concept and project management run-of-river power plant (5 MW)

Siamo spiacenti, questa referenza non è attualmente disponibile nella lingua selezionata. Se avete domande, siamo lieti di rispondervi.
Committente
Georgian International Energy Corporation
Progettazione
IM Engineering Eurasia
Realizzazione
2018–2019
Costo dell'opera
USD 6-7 millions
Prestazioni
  • Assessment of the technical and economic feasibility, taking into consideration prevailing economic, hydrological, topographic, geological, infrastructure and environmental conditions
  • Detailed design
  • Project management and supervision
  • Liaison with the client
Descrizione
The client intends to construct a 5 MW regulated run-of-river power plant on the River Bzhuzha  with dam, settling basin, diversion pipeline, penstock and powerhouse. The generated capacity will flow to the existing 35 kV transmission line, which supplies electricity to local residents of the city of Ozurgeti. The project comprises a technical and economic feasibility study which will propose two alternative schemes. Jointly with the client the most efficient and economic option will be selected.
Dati principali
  • Capacity: 5 MW