Bzhuzha (Georgia): Concept and project management run-of-river power plant (5 MW)
Désolé, cette référence n'est actuellement pas disponible dans la langue que vous avez choisie. Si vous avez des questions à ce sujet, nous vous renseignerons avec plaisir.
Maître d'ouvrage
Georgian International Energy Corporation
Mandataire
IM Engineering Eurasia
Période
2018–2019
Coûts de construction
USD 6-7 millions
Prestations
Assessment of the technical and economic feasibility, taking into consideration prevailing economic, hydrological, topographic, geological, infrastructure and environmental conditions
Detailed design
Project management and supervision
Liaison with the client
Description
The client intends to construct a 5 MW regulated run-of-river power plant on the River Bzhuzha with dam, settling basin, diversion pipeline, penstock and powerhouse. The generated capacity will flow to the existing 35 kV transmission line, which supplies electricity to local residents of the city of Ozurgeti. The project comprises a technical and economic feasibility study which will propose two alternative schemes. Jointly with the client the most efficient and economic option will be selected.