Hinterrhein (GR): Overall renovation of power stations
- Client
- KHR - Kraftwerke Hinterrhein AG, Thusis
- Consultant
- Consortium LI-IM, Thusis (Laymeyer International GmbH and IM Maggia Engineering Ltd)
- Period
- 2007–2017
- Construction costs
- CHF 300 million
- Scope of services
Following stages in accordance with Swiss SIA standards:
- Preliminary design
- Tender documentation
- Detailed design
- Application design
- Construction supervision
- Overall construction management
- Description
Total refurbishment of KHR Hinterrhein’s HPPs
- Main Data
- 3-stage group of power plants with installed power of 650 MW and pumping capacity of 90 MW
- 4 powerhouses with Francis turbines:
- Ferrera 3 x 63 MW
- Bärenburg 4 x 55 MW
- Sils i.D. 4 x 60 MW
- Thusis 2 x 20 MW
- Hydromechanical equipment:
- Spillway, bottom outlet, intake gates
- Water transportation:
- Pressure tunnel 30 km
- Pressure shafts 1.7 km
- Supply tunnels 16 km
- Access tunnels 1.3 km
- Water intakes 13
- Reservoirs:
- Preda Reservoir
- Valle di Lei Reservoir
- Ferrera Reservoir
- Sufers Reservoir
- Bärenburg Reservoir
- Switchyards
- in Ferrera and Bärenburg
- controlled by Sils powerhouse