Fangut (Albania): dam and hydropower Project (65 MW)
Client
Ayen Enerji AS Tirana / Albania
Consultant
IM Maggia Engineering Ltd in association
Period
2010–2018
Construction costs
€ 120 million
Scope of services
Feasibility study, construction design, tender documents, realisation and project supervision, workshop tests, general site supervision, commissioning.
Description
The Fangut HEPP consists of a CFRD dam which forms a reservoir of 135 million m3, a 9,500 m long pressure tunnel, surge tank, valve chamber, 260 m long penstock and power house with two vertical Francis turbines and tailrace channel.