Trabzon (Turkey): New Hydroelectric Power Plant Büyükdüz

Siamo spiacenti, questa referenza non è attualmente disponibile nella lingua selezionata. Se avete domande, siamo lieti di rispondervi.
Committente
Ayen Energy Co. Inc., Ankara / Turkey
Progettazione
IM Maggia Engineering Ltd
Realizzazione
2008–2012
Costo dell'opera
€ 80 million
Prestazioni
Feasibility study, construction design, tender documents, realisation and project supervision, workshop tests, general site supervision
Descrizione
New construction of a hydroelectric power plant on the Elmali and Tasoba rivers in northeast Turkey (Trabzon region). Construction of two reservoirs for daily compensation with intakes and fish pass, connection galleries, surge tank and forebay, penstock, power house, switchyard and transmission line.
Dati principali
  • 2 reservoirs, intakes and desanders on the Elmali and Tasoba rivers with fish pass
  • Gallery lengthtotal = 12 km, Ø 4 m
  • Surge tank with forebay
  • Penstock DN2000, L = 1690 m in welded steel
  • Powerhouse:
    • QA =    16 m³/s
    • HN =    500 m
    • PA =    70 MW
  • 2 6-jet vertical Pelton turbines
  • 2 spherical valves DN1000, PN64
  • 2 generators 35 MVA
  • 2 closed circuit cooling water systems
  • 2 transformer units
  • Switchyard